Birmingham Children’s Hospital
Zenith Pola Flooring Ltd was appointed by contractors, William Gough, to work on the refurbishment of Ward 10 High Dependency Unit at Birmingham Children’s Hospital, located in Birmingham City Centre.
With children needing to return to the unit by the end of the month, Zenith had just three and a half weeks to complete the flooring installation. Located on the third floor, the project was further complicated by limited access, with materials and waste products having to be transported via the fire escape. The client selected resin flooring as an alternative to the existing vinyl floor, which required constant maintenance, causing logistical and operational problems. In contrast, ComfortFloor Pro resin flooring is completely seamless, extremely hardwearing and easily cleaned, with excellent acoustic qualities, comfortable underfoot and a ten-year guarantee.