Jaguar Land Rover, Whitely, Coventry

After much consultation with other installers & manufacturers, Remmers were chosen to produce a suitable flooring system to resurface over 15,000m2 at the Engineering Centre in Whitely.

The design brief was to provide a new resin flooring surface which was easy to clean, slip & scratch resistant with a silk finish that was also resistant to the chemical stains associated with a very busy automotive engineering facility. A proposed system was installed as a working sample for client testing & approval. Due to the high volume, fast paced work that is carried out at the facility, the works needed to be carried out over a 4 day schedule, enusring that only 1 working shift was lost throughout each phase of the refurbishment. Throughout the works 4M floors Limited were required to adhere to the stringent waste management policy utilised by the client.

Credits