THE RESIN FLOORING ASSOCIATION

TELEPHONE: _07484 075 254

IFT contracted at Aberdeen International Airport

IFT were contracted by Tilecraft to install screed in the middle of the airport terminal as part of Aberdeen International Airport’s ambitious £20m terminal transformation project.

IFT carried out the floor preparation and setting of levels prior to the application of 900sqm Self Level Screeds, in order to provide suitable surface regularity for the installation of the floor tiles. Due to the location of the works being carried out, it was imperative there was minimal disruption to the airport passengers whilst IFT worked on bringing them the new modern facilities. The redevelopment at Aberdeen International Airport will see a 50% extension of the existing terminal – the biggest upgrade since it first opened in 1977 – along with new equipment and facilities including domestic and international baggage reclaim areas.

View Case Study

CREDITS


Integrated Flooring Technologies   

News

Newsletter

If you would like to receive our Newsletter and get all the latest updates, please enter your details below. FeRFA will not disclose your details to any third party. All emails include an unsubscribe link.

First Name:
Last Name:
Your Email:

FeRFA Contact Details

FeRFA
PO BOX 3716, 
STONE, 
STAFFORDSHIRE ST15 9EU

TELEPHONE: 07484 075 254

EMAIL FERFA


Follow us on Twitter

Registered in England No 954060
VAT Registration No 320 5799 58
© FeRFA the Resin Flooring Association     DISCLAIMER

Fair PaymentCobra Insurance Brokers LogoReduce Reuse Recycle Logo