THE RESIN FLOORING ASSOCIATION

TELEPHONE: _07484 075 254

Royal Refurb By Central Flooring Services and Flowcrete

Exceptional environmental targets were met on the refurbishment of the Royal Mail sorting depot.

10,000m2 of failing bitumen flooring was removed and replaced with a 10mm flowable industrial screed within a 4 week period. 286 tonnes of waste bitumen material was recycled for local road schemes and the newly installed screed contained 38% recycled material. This project was Highly Commended the Large Industrial Project of the Year Award at the 2017/18 Best Practice Awards.

CREDITS


Central Flooring Services Ltd   
Flowcrete UK Ltd

News

Newsletter

If you would like to receive our Newsletter and get all the latest updates, please enter your details below. FeRFA will not disclose your details to any third party. All emails include an unsubscribe link.

First Name:
Last Name:
Your Email:

FeRFA Contact Details

FeRFA
16 Edward Road
Farnham
Surrey GU9 8NP

TELEPHONE: +44 (0)_1252 714250

EMAIL FERFA

Follow us on Twitter

Registered in England No 954060
VAT Registration No 320 5799 58
© FeRFA the Resin Flooring Association     DISCLAIMER

Fair PaymentCobra Insurance Brokers LogoReduce Reuse Recycle Logo