Seamless solution for Dairygold

In Dairygold’s Cheese Grater Area Kemtile laid 600 square metres of BASF seamless resin flooring, installed stainless steel kerbs and drains.

The Dairygold and Haslington Cheese Co Ltd in Crewe process a wide range of shredded, grated, cubed, sliced and diced cheeses. In the Cheese Grater Area Kemtile constructed an underground drainage system, a new grease trap interceptor, laid 600 square metres of BASF seamless resin flooring and installed stainless steel kerbs and drains. Kemtile created new falls to the floors with a concrete screed, installed ceiling panels six metres off the finished floor level and created a steel mezzanine area as a bay for cheese pallets to be loaded onto wagons for distribution. This area was constructed complete with loading docks and dock levellers. Door openings were made to join the new building to the existing one and the white wall panelling was matched to the existing cladding where the new building joins the original. Kemtile also created a new entrance to the site with pathways, gates, gardens and line markings for parking.

Credits